Challenge

Advance the development of electrical test and measurement devices—by realizing quality, cost, delivery, and service improvements—while increasing manufacturing efficiency.

Solution

Implement SOLIDWORKS Premium software for design and analysis along with Certified Gold Product SimpoeWorks plastic injection simulation software.

Results

  • Shortened design cycles by 30 percent
  • Accelerated time-to-market by 30 percent
  • Cut development costs by 30 percent
  • Reduced prototyping cycles by 30 percent

Using the simulation capabilities of SolidWorks Premium, we can do more prototyping in software and produce fewer physical prototypes.

Hiroshi Mizuide
Manager of Development Assistance, Engineering Department